[/biology/includes/page_links_cwi.htm]
|
| Clean Water Institute |
| Table 2.Summary of Bank Erosion Potential based on Particle Size along Lycoming Creek* |
| Summer 2002** |
| Total Banks |
| Erosion Potential |
Number |
Percent |
| Low |
7 |
6.48% |
| Moderate |
72 |
66.67% |
| High |
29 |
26.85% |
| Total |
108 |
|
| Right Banks |
| Erosion Potential |
Number |
Percent |
| Low |
3 |
5.17% |
| Moderate |
35 |
60.34% |
| High |
20 |
34.48% |
| Total |
58 |
|
| Left Banks |
| Erosion Potential |
Number |
Percent |
| Low |
4 |
8.00% |
| Moderate |
37 |
74.00% |
| High |
9 |
18.00% |
| Total |
50 |
|
|
* Study area between Roaring Branch and Lower Heshbon Road
|
|
**Completed by Lycoming College Clean Water Institute Interns
|
|
|
|