[/biology/includes/page_links_cwi.htm]
|
| Clean Water Institute |
| Table 2.Summary of Bank Erosion Potential based on Bank Heights along Lycoming Creek* |
| Summer 2002** |
| Total Banks |
| Erosion Potential |
Number |
Percent |
| Low |
36 |
33.33% |
| Moderate |
44 |
40.74% |
| High |
28 |
25.93% |
| Total |
108 |
|
| Right Banks |
| Erosion Potential |
Number |
Percent |
| Low |
26 |
44.83% |
| Moderate |
23 |
39.66% |
| High |
9 |
15.52% |
| Total |
58 |
|
| Left Banks |
| Erosion Potential |
Number |
Percent |
| Low |
10 |
20.00% |
| Moderate |
21 |
42.00% |
| High |
19 |
38.00% |
| Total |
50 |
|
|
* Study area between Roaring Branch and Lower Heshbon Road
|
|
**Completed by Lycoming College Clean Water Institute Interns
|
|
|
|