Table 1: Summary of Disturbances along Buffalo Creek

 

 

 

 

 

 

 

 

 

 

 

Structure

 

Amount

 

Percentage of 614

 

 

 

 

Gravel Bars

 

45

 

7.33%

 

 

 

 

Mid-Channel Bars

 

68

 

11.1%

 

 

 

 

Point Sources

 

50

 

8.14%

 

 

 

 

Rip rap

 

32

 

5.21%

 

 

 

 

Debris Deposit

 

2

 

0.33%

 

 

 

 

Tributaries

 

18

 

2.93%

 

 

 

 

Bridges

 

25

 

4.07%

 

 

 

 

Foot Bridges

 

8

 

1.30%

 

 

 

 

Total Erosion Sites

 

366

 

59.6%

 

 

 

 

Left Bank Erosion Sites

 

170

 

46.4%

 

 

 

 

Right Bank Erosion Sites

 

196

 

53.6%

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 Chart 1:

 

 

 

 

 

 

 

 

Return to the Report