Table 1: Summary of Disturbances along Black Hole Creek
                 
    Structure   Amount   Percentage of 215    
    Bridges   18   8.37%    
    Pipes   20   9.30%    
    Rip Rap   15   7.44%    
    Rock dams   2   0.93%    
    Deposition Bars   36   16.74%    
    Major Tribs.   3   1.40%    
    Intermittent Tribs.   7   3.26%    
    Ephemeral Tribs.   15   6.98%    
    Dried Point Sources   1   0.47%    
    Total Erosion Sites   98   45.58%    
    Right Bank Erosion   48   22.33%    
    Left Bank Erosion   50   23.26%    

 
 

*Study area is the entire Black Hole Creek

**Completed by Lycoming College Clean Water Institute Interns Summer 2003

Back to CWI Reports