Infrastructure Outages
Infrastructure - Misc. switch upgrades - (Planned Outage)
Started 11/23/05 7:25am Completed 11/23/05 3:30pm
Summary: Updated IOS on switches.
Infrastructure - Misc. building wiring upgraded - (Planned Outage)
Started 10/14/05 7:25am Completed 10/14/05 8:30am
Summary: Rebooted the server and restarted WebAccess services.
Outside Router - Main router connecting to the internet (Planned Outage)
Started 10/3/045 7:30am Completed 10/3/05 7:40 am
Summary: Upgraded IOS
Crever Hall - Student Residence Hall (Unplanned Outage)
Discovered 9/23/05 7:45 am - Functional 9/23/05 8:15am
Summary: Fiber connection bad. Switched fiber pairs
Internet Access - (Unplanned Outage)
Discovered 9/14/04 11:42am Resolved 9/14/04 3pm
Summary: External ISP connection was down
Edge Switches - Switches connecting to the core switch (Planned Outage)
Started 6/16/04 7:30am Completed
Summary: Upgraded IOS
Core Switch - Main switch connecting the network (Planned Outage)
Started 6/18/04 7:30am Completed 6/18/04 7:35am
Summary: Upgraded IOS
PIX - Firewall (Planned Outage)
Started 6/17/04 7:30am Completed 6/17/04 7:40am
Summary: Upgraded IOS
Outside Hub - Connection to the internet (Planned Outage)
Started 6/16/04 7:30am Completed 6/16/04 7:35am
Summary: Upgraded IOS
Cisco Switch Replaced (Planned Outage)
Started 5/6/04 7:30am Completed 5/6/04 8:35am
Summary: upgrading switch
Wireless Access - Pennington (Planned Outage)
Started 4/9/04 8am Completed 4/9/04 11 am
Summary: upgrading access point
Wireless Access - Library 3rd and 4th Floors (Planned Outage)
Started 4/9/04 8am Completed 4/9/0411am
Summary: upgrading access point
Wireless Access - Library 1st and 2nd Floors (Planned Outage)
Started 4/8/04 9am Completed 4/8/04 2:10pm
Summary: upgrading access point
Outside hub (Planned Outage)
Started 3/12/04 7:30am Completed 3/12/04 8:00am
Summary: Replaced Cisco 1924 with Cisco 2950
Skeath Hall Hubs (Unplanned Outage)
Reported 12/01/03 7:55 am Resolved 12/01/03 10:27 am
Summary: Replaced a Cisco 3524 hub.